Commit Graph
9 Commits
Author SHA1 Message Date
Valentin Popov b1408b0907 feat(vulkan): draw original terrain geometry
Docs Deploy / Build and Deploy MkDocs (push) Successful in 35s
Test / Lint (push) Failing after 2m11s
Test / Test (push) Skipped
Test / Render parity (push) Skipped
2026-07-18 08:46:16 +04:00
Valentin Popov 283b48e8c5 feat(render): draw original MSH through Vulkan
Docs Deploy / Build and Deploy MkDocs (push) Successful in 34s
Test / Lint (push) Failing after 1m58s
Test / Test (push) Skipped
Test / Render parity (push) Skipped
2026-07-18 07:21:29 +04:00
Valentin Popov ba5992cc56 build(deps): pin internal path dependency versions
Docs Deploy / Build and Deploy MkDocs (push) Successful in 34s
Test / Lint (push) Failing after 2m23s
Test / Test (push) Skipped
Test / Render parity (push) Skipped
2026-07-18 05:40:24 +04:00
Valentin Popov 14ea45d49a build(vulkan-shaders): source tool metadata at build time 2026-06-25 11:45:39 +04:00
Valentin Popov 0a78fc2460 refactor(vulkan-reporting): remove manual json assembly 2026-06-25 11:45:34 +04:00
Valentin Popov e6778d43af feat: add Vulkan shader manifest validation 2026-06-23 23:01:34 +04:00
Valentin Popov 8ea1fd5c18 feat: probe Vulkan loader boundary 2026-06-23 22:43:54 +04:00
Valentin Popov 69c032acca feat: add Vulkan capability selection boundary 2026-06-23 22:40:01 +04:00
Valentin Popov f8e447ffee feat: close stage 0-2 audit groundwork
Remove legacy SDL/OpenGL adapters from the workspace and introduce winit/Vulkan adapter boundaries for the rendered composition root.

Add reproducible toolchain and xtask CI coverage for formatting, tests, clippy, docs, policy, deny, acceptance auditing, and hosted OS matrix evidence.

Strengthen Stage 1 data contracts with byte-first paths, VFS hardening, structured diagnostics, RsLi writer/edit scaffolding, corpus reporting, and resource error classification.

Advance Stage 2 asset preparation by moving mission loading through assets/runtime boundaries, materializing prototype graph data, preserving provenance, and adding inspection/viewer integration.

Record the Stage 0-2 audit input, acceptance roadmap, coverage updates, and documentation notes for follow-up evidence.
2026-06-23 22:05:16 +04:00